User-Friendly Gold Processing Machine for Advanced Gold Recovery Techniques

Customization: Available
Type: Gravity Separator
Voltage: Custom Made

Product Description

Basic Info.
Model NO.
GMTS1548
Weight
>10T
Material
Carbon Steel
Certification
ISO9001:2008, CE
Warranty
1 Year
Usage
Separation Screening
Advantage
High Output
Capacity
5000 pieces/Year
Product Description

Gold Mobile Trommel Screen 1548

Our top-tier mobile trommel screen excels in gold screening. Its compact, mobile design suits industries like gold mining and building materials. Ideal for dry land, beaches, and ancient rivers, it's highly integrated and enhances efficiency, reducing labor costs.

Gold Mobile Trommel Screen
Main Features & Recovery Line
Gold Recovery Techniques

Large Capacity Rock Gold Ore Processing Line

Efficiently transform raw gold ore into gold bars! Use the Gold Washing Trommel for cleaning and screening. Maximize gold recovery with this high-capacity, low-maintenance line. It's mobile, easy to operate, and durable—turn ore into profit faster.

Processing Line
Working Principle
Working Principle

1. Raw Material Loading

Materials enter via hopper inlet. A high-pressure nozzle spreads materials onto the trommel screen.

2. Washing and Selection

Rotating screen cleans materials with water flow, using gravity separation to capture gold.

Technical Specifications
Model Capacity (t/h) Power (kw) Diameter (mm) Length (mm)
GMTS 05195-101.55001910
GMTS 102010-30410002000
GMTS 122530-505.512002500
GMTS 154880-1501115004800
GMTS 1848100-2001518004800
Material Applications
Model Selection Guide

How to select the suitable model?

Please consider the following factors for a recommendation:

  • ✔ Alluvial or rock gold mining?
  • ✔ Presence of clay in feed materials?
  • ✔ Expected capacity (Tons per hour)?
  • ✔ Power preference (Motor or Diesel)?
Frequently Asked Questions
Q: What is the delivery time for the equipment?
A: Typically 7-10 days for items in stock, and 15-30 days for large or custom orders.
Q: How long does the installation process take?
A: On-site installation generally takes 7-10 days once the site and materials are ready.
Q: What power options are available?
A: Our equipment supports electric motors, diesel engines, and generator sets to provide maximum flexibility for different sites.
Q: Do you offer a warranty and spare parts?
A: Yes, we provide a one-year warranty and ensure long-term availability of affordable spare parts.
Q: Can you provide a complete processing solution?
A: Absolutely. We offer full design-to-installation service packages, including equipment selection and site layout.
Q: What are the primary payment terms?
A: Our standard terms are a 30% deposit via T/T in advance, with the remaining 70% balance settled before shipment.

Related Products